Previous Projects


Vessel Imagine
Catalina 25

List of Work Performed:

-Vessel's swing keel was removed, sandblasted, fared, barrier coated along with a complete barrier coat job to bottom of the vessel
-New Ray Marine instrument pack installed
-New wench for keel was installed
-Installed all new standing rig and running rig
-Led halyards to cock pit
-Re-beded large portion of deck hardware
-Have provided an annual service
-Installed tiller pilot, replaced an appreciable amount of electrical system along with breaker panel, and installed a heavy duty outboard engine bracket
Vessel Imagine

Back-
Previous Projects Menu