Vessel Imagine Catalina 25 List of Work Performed:-Vessel's swing keel was removed, sandblasted, fared, barrier coated along with a complete barrier coat job to bottom of the vessel -New Ray Marine instrument pack installed-New wench for keel was installed-Installed all new standing rig and running rig -Led halyards to cock pit-Re-beded large portion of deck hardware -Have provided an annual service -Installed tiller pilot, replaced an appreciable amount of electrical system along with breaker panel, and installed a heavy duty outboard engine bracket |
|