List of Work Performed:-We replaced failing aluminum water tank with two custom stainless steel water tanks along with increased storage capacity. -The old tank was built into the hull, requiring cabin sole to be cut up for access to old tank. Tank was cut into pieces to be removed. -The aluminum of the old tank was too light a gauge material and found extensive corrosion and freeze damage. New tanks are 12 gauge stainless steel with baffles.-After installation of tanks, reframing of floor and a new cabin sole will be installed and finished.