Previous Projects


Vessel Tide
1975 C & C 38 Standard

-Restorated, refinished with Awl Grip, repaired and refitted to all the deck's, replaced all deck hardware and all standing and running rigging.
-Repairs to keel and rudder, barrier coat, and bottom finishes.
-The engine has been removed for extensive replacement of all peripherals on engine (starter, alternator, heat exchange, exhaust, manifolds, fuel pumps.)
-All thru hulls and valves have been replaced. All supporting plumbing, hoses, clamps, and cockpit drains.

Current Projects-
Vessel Tide

Vessel Tide

Vessel Tide

-The deck to hull joint seal had failed so the aluminum toe rails have been removed and sent out for coating. The deck to hull joint has been separated, cleaned, and prepared to facilitate the reseal and refastening. All thru deck fasteners are replaced with new and are re-bedded.


-This vessel last year received a complete
rewire of the DC and AC systems with extensive
upgrades to the entire electrical system.

Vessel Tide

Next-
Vessel Tide Continued

Back-
Previous Projects Menu