List of Work Performed: - Vessel Zoe had extensive gel coat cracking raising, some small fiberglass damage, someone had previously tried to refinish and conceal the underlying gel coat that had failed. -Vessel was stripped entirely of all its hardware and trim. All coatings were stripped from the outside of the hull down to bare fiberglass. -Glass repairs were completed, fairing work done then a complete Awl Grip finish was applied to hull. -All woodwork was stripped and revarnished. Some small pieces of rigging were added . -Vessel was completely reassembled. -New trailer was provided and fit to hull. -A custom bag was made to store the entire rig with sail.